| Kitsumkalum Head Start | 25-100 | proposal out | 70 d |
| Airport Terminal | 16-133 | closeout | 70 d |
| Airport Tie-Downs | 17-137 | closeout | 70 d |
| Sik-e-dakh 3-plex Septic | 18-133 | closeout | 70 d |
| Telegraph Creek Septic | 18-172 | closeout | 70 d |
| BVCDC Perimeter Drain | 19-134 | closeout | 70 d |
| Evergreen Bioheat Ltd | 19-154 | closeout | 70 d |
| Houston Health Center | 21-112 | closeout | 70 d |
| MacEachern Wall | 21-133 | closeout | 70 d |
| BC PARKS ROSS LAKE | 21-164 | closeout | 70 d |
| Plug Tricon Granisle Plant Structural Schedules | 21-180 | closeout | 70 d |
| Yellowridge Gitxsan Longhouse Civil | 21-213 | closeout | 70 d |
| RDKS USRC Sewer and Slab Investigation | 21-226 | closeout | 70 d |
| Gitwangak Modular Bldg Inspection | 22-205 | closeout | 70 d |
| Smithers Gymnastics Survey & Civil | 23-127 | closeout | 70 d |
| Coles Foundation | 26-143 | proposal out | 70 d |
| Glen Vowell Recreation Centre | 15-119 | closeout | 70 d |
| Glen Vowell Septics 2016 | 16-140 | closeout | 70 d |
| Moricetown RV Park | 17-108 | closeout | 70 d |
| Ben Forsyth Septic | 17-110 | closeout | 70 d |
| Glen Vowell Septics 2017 | 17-133 | closeout | 70 d |
| Smithers Cohousing Corporation | 18-111 | closeout | 70 d |
| Hy-Tech Washbay Detailed Design | 18-131 | closeout | 70 d |
| New Hazelton Community Hall | 18-146 | closeout | 70 d |
| Tyhee Lake Provincial Park | 18-180 | closeout | 70 d |
| Lakelse Provincial Park | 18-184 | closeout | 70 d |
| V&C Strata Smithers | 19-129 | closeout | 70 d |
| Parks Tyhee Septic | 19-167 | closeout | 70 d |
| Witset Passive House Civil | 19-168 | closeout | 70 d |
| Granisle WTP Seismic | 19-169 | closeout | 70 d |
| SSS Shop Addition | 20-107 | closeout | 70 d |
| Grassy Plains MWR OP | 20-125 | closeout | 70 d |
| Glen Vowell Septics | 20-142 | closeout | 70 d |
| Houston CC - West | 20-144 | closeout | 70 d |
| G&L Boonstra Const. Plate Culvert | 20-159 | closeout | 70 d |
| Terrace Vehicle Inspection | 21-124 | closeout | 70 d |
| Aqua North Granisle WWTP Seismic | 21-153 | closeout | 70 d |
| V&C Civil Construction 2021 | 21-157 | closeout | 70 d |
| BC Parks Tyhee Rec Dwgs CP22SME007 | 21-168 | closeout | 70 d |
| BC Parks Lakelse Rec Dwgs CP22SME007 | 21-169 | closeout | 70 d |
| Czornohalan-Boland Lot 6 HBM Estates | 22-152 | closeout | 70 d |
| Town of Smithers Perimeter Trail | 22-158 | closeout | 70 d |
| Tricon Gitwangak Daycare Trusses | 22-197 | closeout | 70 d |
| WIC Additional Survey | 22-210 | closeout | 70 d |
| SCM Ventures Seismic Review | 23-174 | closeout | 70 d |
| Cdn Craftsman Builders Bicklmaier | 26-144 | proposal out | 70 d |
| Cdn Craftsman Builders Werner Shop 3860 Harvie Rd | 26-145 | proposal out | 70 d |
| DoH Lifecycle Maintenance Plan | 18-114 | design development | 68 d |
| Proposals | 15-000 | design development | 68 d |
| PROPOSALS | 16-000 | design development | 68 d |
| Plan-20160720 | 16-181 | design development | 68 d |
| Proposals | 17-000 | delivery | 68 d |
| Gitanmaax Firehall | 17-104 | field work | 68 d |
| Ksan Village Survey | 17-122 | design development | 68 d |
| Proposals | 18-000 | delivery | 68 d |
| Gitanmaax Gas Bar Building Conceptual2 | 18-108 | design development | 68 d |
| Gitxsan Forests Inc2 | 18-190 | delivery | 68 d |
| TEMPLATE Folder | 18-999 | field work | 68 d |
| Proposals | 19-000 | design development | 68 d |
| Proposals | 21-000 | field work | 68 d |
| Telkwa Lake Wildfire | 21-100 | delivery | 68 d |
| Corneau Structural | 21-101 | delivery | 68 d |
| TRICON NSDP NEW HAZELTON | 21-132 | delivery | 68 d |
| Smithers Perimeter Trail Design & Construct | 21-145 | delivery | 68 d |
| Witset First Nation Youth Healing | 21-161 | delivery | 68 d |
| Armour Axe Rd Granisle Landslide Assessment | 22-105 | delivery | 68 d |
| Daryl Nadeau Cut Truss | 22-106 | delivery | 68 d |
| Files | 22-107 | delivery | 68 d |
| Guy Stewart ESA 1 | 22-108 | delivery | 68 d |
| HTS D. Bobb Lot A | 22-109 | delivery | 68 d |
| Matthew Carpenter Construction | 22-110 | delivery | 68 d |
| BC Housing Wrinch Memorial Hazelton | 22-117 | delivery | 68 d |
| DH Manufacturing | 22-118 | delivery | 68 d |
| Vestch Macedo | 22-119 | delivery | 68 d |
| BVCS Chris Steenhof | 22-120 | delivery | 68 d |
| Hank Batch Plant Smithers | 22-121 | delivery | 68 d |
| Big Dog Strata Subdivision Burns Lk | 22-130 | delivery | 68 d |
| Small Hall Smithers | 22-131 | delivery | 68 d |
| RaeJean Laidlaw Pool | 22-132 | delivery | 68 d |
| DH Manufacturing Plant Addition | 22-133 | delivery | 68 d |
| Posselt Shop | 22-134 | delivery | 68 d |
| Studio9 Affordable Housing | 22-135 | delivery | 68 d |
| Stair Project | 22-142 | delivery | 68 d |
| Kispiox Health Centre | 22-143 | delivery | 68 d |
| Gitwanga inspection | 22-144 | delivery | 68 d |
| Johnson Basement | 22-145 | delivery | 68 d |
| Central Park Designery 1A | 22-146 | design development | 68 d |
| DLK-BVES Civil SI Front Entry 25-10-23 | 22-177 | billing and payment | 68 d |
| dk Arch Kispiox Health Centre | 23-100 | delivery | 68 d |
| Telkwa Firehall Refit - DUPLICATE | 23-117 | delivery | 68 d |
| Menzel Barn and Addition - DUPLICATE | 23-129 | delivery | 68 d |
| Bjorgaard Dease Lk Airport Sewage Sys. Construction | 23-132 | delivery | 68 d |
| TNDC Septic Sys Site Investigation Dease Lk | 23-141 | delivery | 68 d |
| Erik Olofsson Const. Witset FN Concrete Testing | 23-143 | delivery | 68 d |
| Stairs and Ramps 1C | 23-146 | delivery | 68 d |
| Northern Lights College Septic Design Dease Lk | 23-156 | delivery | 68 d |
| BC Housing RFPQ | 24-103 | delivery | 68 d |
| DLK Daycare | 24-104 | delivery | 68 d |
| Shimon Raina House Renovations | 24-105 | delivery | 68 d |
| Rivard | 24-106 | delivery | 68 d |
| CCB Quanstrom Lot A Yellich | 24-107 | delivery | 68 d |
| Hudson Bay Mobile Home Park | 24-108 | delivery | 68 d |
| Burns Lake Modular | 24-115 | field work | 68 d |
| Corneau 1533 Chestnut Cres. Front Porch Structural | 24-116 | delivery | 68 d |
| Meridith | 24-117 | delivery | 68 d |
| Palling Community Hall | 24-118 | delivery | 68 d |
| Mercedes Beans Coffee, Hazelton | 24-119 | delivery | 68 d |
| Heissig Atlin | 24-120 | delivery | 68 d |
| Wildfire Base | 24-129 | delivery | 68 d |
| Genx 2304 Bold Rd Structural Houson - DUPLICATE | 24-130 | delivery | 68 d |
| North Central Iskut Mechanical Seismic Certification - DUPLICATE | 24-131 | billing and payment | 68 d |
| Driftwood School Structural (1) | 24-132 | delivery | 68 d |
| Dykstra 2532 High Rd Reno Structural Telkwa | 24-133 | delivery | 68 d |
| Wright Enclosed Carport Smithers - DUPLICATE | 24-146 | delivery | 68 d |
| RPE Glulam Beams Coast Mtn College Smithers | 24-147 | delivery | 68 d |
| Shoop-McCreery Septic Feasibility Hazelton | 24-148 | delivery | 68 d |
| Studio 9 DLK Friendship Centre Deck | 24-149 | delivery | 68 d |
| Studio 531 Wet'suwet'en FN Building Lake Kathlyn | 24-150 | billing and payment | 68 d |
| Earnest Harding Cedar St Subdivision | 24-157 | delivery | 68 d |
| G. Poirier Construction Energy Modelling | 24-158 | delivery | 68 d |
| Palling Community Hall Structural Improvements | 24-159 | delivery | 68 d |
| Terrain Fencing MT | 24-160 | delivery | 68 d |
| Claims-Pro Pizza Hut | 24-161 | delivery | 68 d |
| West Fraser CT | 24-169 | delivery | 68 d |
| Gitwangak FN Kitwanga Tiny Homes | 24-170 | delivery | 68 d |
| Yellowridge DLK Smithers CT | 24-171 | delivery | 68 d |
| SD91 WW System Manual Update | 24-172 | delivery | 68 d |
| Colas MT 10th Ave Houston | 24-173 | delivery | 68 d |
| Lubbers CT Can Tire | 24-181 | delivery | 68 d |
| Tricon Granisle Seniors Housing - DUPLICATE | 24-182 | delivery | 68 d |
| Doogan-Smith Two Sisters Awning | 24-183 | delivery | 68 d |
| Lakes Dist. Maint. As&When Palling Rest Area Sewage Sys | 24-184 | delivery | 68 d |
| Tricon Smithers Airport WTP | 24-185 | delivery | 68 d |
| West Fraser New Building Smithers | 25-104 | delivery | 68 d |
| SD54 Telkwa School Entry - DUPLICATE | 25-105 | delivery | 68 d |
| Chandler Park Depreciation report | 25-106 | delivery | 68 d |
| Yellowridge As & When DLK Housing - DUPLICATE | 25-107 | delivery | 68 d |
| HTS Sparrows | 25-108 | delivery | 68 d |
| Burns Lake Solar | 25-116 | delivery | 68 d |
| Kitsumkalum Phase 2 | 25-117 | delivery | 68 d |
| Smithers VIC | 25-118 | delivery | 68 d |
| Houston Leisure Facility Retrofit - DUPLICATE | 25-119 | delivery | 68 d |
| Olofsson Witset FN Material Testing - DUPLICATE | 25-120 | field work | 68 d |
| Miller Lot 9 HBME | 25-129 | field work | 68 d |
| Mr. Handiman Dahliwal | 25-130 | delivery | 68 d |
| Burns Lake Arena Feasibility 2 | 25-131 | delivery | 68 d |
| Elite | 25-132 | delivery | 68 d |
| Gymnastics Structural | 25-133 | delivery | 68 d |
| Scott Sanders House 5040 Morris Rd Telkwa | 25-134 | delivery | 68 d |
| Ambleside Phase 9 MT | 25-140 | field work | 68 d |
| Bouck Omineca FR4 | 25-141 | delivery | 68 d |
| Burns Lake Arena Solar Panels | 25-142 | delivery | 68 d |
| Jan 9 2026 CT 8 DLK Smithers | 25-143 | delivery | 68 d |
| Sanders 5040 Morris Rd MT Telkwa | 25-146 | billing and payment | 68 d |
| BAT Construction MT Hanna Creek Bridge | 25-154 | field work | 68 d |
| RPE Gitxsan Child Family Services Bldg Hydrant Testing | 25-156 | delivery | 68 d |
| DFO Meziadin Fisheries Science Platform Improvements | 25-157 | delivery | 68 d |
| DFO Witset Canyon Boardwalk Improvements | 25-158 | delivery | 68 d |
| Fellowship Baptist Church Lift | 25-159 | billing and payment | 68 d |
| Elite 1498 Walnut St. Structural Assessment | 25-166 | delivery | 68 d |
| CCB Kiesha Matthews Residence Telkwa | 25-167 | delivery | 68 d |
| Gore Mutual Bldg Damage 1366 Poplar Telkwa | 25-168 | delivery | 68 d |
| Douglas Residence May 22, 2026 FRAMING | 25-169 | delivery | 68 d |
| Aqua N. Granisle Seniors Centre Mechanical Seismic | 25-170 | delivery | 68 d |
| Glacier Elec. Granisle Seniors Centre Electrical Seismic | 25-171 | delivery | 68 d |
| HTS Houston Church LiftINCORRECT NAME | 26-102 | billing and payment | 68 d |
| Northern Edge Structural - INCORRECT NUMBER&NAME | 26-103 | delivery | 68 d |
| N. Edge Sport Assoc. Building Improvements | 26-104 | delivery | 68 d |
| Gitanmaax Firehall Improvements | 26-105 | delivery | 68 d |
| Larson Duplex 1544 Cottonwood St. Telkwa | 26-106 | delivery | 68 d |
| Fisheries & Oceans Nadina Spawning Channel Civil Works | 26-114 | delivery | 68 d |
| Dykstra Construction | 26-115 | field work | 68 d |
| CT 1 | 26-116 | billing and payment | 68 d |
| DKI Roof Inspection 1410 Columbia Dr Smithers | 26-117 | delivery | 68 d |
| Kispiox Band Halliday Ranch Transition Housing | 26-118 | billing and payment | 68 d |
| Kispiox Band Housing Condition and Lifecycle Assessments | 26-119 | delivery | 68 d |
| West Fraser Concrete MT Telkwa School Curb & Gutter | 26-125 | delivery | 68 d |
| West Horizon MT Princess Street Smithers | 26-126 | billing and payment | 68 d |
| Henwood Foundation Inspection 4939 13th Ave New Hazelton | 26-127 | delivery | 68 d |
| Village of Granisle MT North Building Site | 26-128 | delivery | 68 d |
| Woodmere Nursery Building Recover & Occupancy Feasibility | 26-129 | field work | 68 d |
| Progrus MT Sidewalk Repairs 10th Ave Houston | 26-136 | billing and payment | 68 d |
| Skubovious Subdivision - Continued | 26-137 | design development | 68 d |
| Coles Foundation Movement Assessment 2197 Cote Rd Smithers | 26-138 | field work | 68 d |
| Elite-DKI Roof Inspection Tyler George 1369 Coalmine Rd Telkwa | 26-139 | billing and payment | 68 d |
| Kispiox School Energy Assessment | 26-140 | billing and payment | 68 d |
| DFO Witset Bridge Fix | 26-141 | field work | 68 d |
| Round Lake Improvements | 26-142 | field work | 68 d |
| Gitxsan Forests Inc - Structural2 | 18-151 | delivery | 68 d |
| Proposals | 20-000 | field work | 68 d |
| Burns Lake Wildfire Centre | 21-103 | delivery | 68 d |
| Hans Duerichen Change of Engineer | 21-104 | delivery | 68 d |
| Telkwa Reservoir | 21-106 | delivery | 68 d |
| HTS Small Jobs DON'T ADD TO THIS | 21-122 | delivery | 68 d |
| Skate Park Survey | 21-126 | delivery | 68 d |
| Hamp Wildfire Centre | 21-144 | delivery | 68 d |
| Prestige Aquatic | 21-155 | delivery | 68 d |
| Smithers Condition Assessment | 21-156 | delivery | 68 d |
| City West Fraser Lake | 21-159 | delivery | 68 d |
| TEMPLATES | 21-999 | delivery | 68 d |
| ARCHIVED PROJECTS | 22-000 | field work | 68 d |
| ToS Airport | 22-102 | delivery | 68 d |
| TED NUGENT POOL | 22-103 | delivery | 68 d |
| Kent Swim Spa Building | 22-104 | delivery | 68 d |
| Elite Restoration Roi Theatre | 22-111 | delivery | 68 d |
| Kispiox Gas Bar Structural | 22-112 | delivery | 68 d |
| Nelsie | 22-113 | delivery | 68 d |
| Northwest Fire Center Building | 22-114 | delivery | 68 d |
| Vector Projects Smithers | 22-115 | delivery | 68 d |
| BVES Office | 22-116 | delivery | 68 d |
| Bastin Geotech Investigation Poplar Rd | 22-122 | delivery | 68 d |
| Krause HBM Ski Cabin Design | 22-123 | billing and payment | 68 d |
| Valerie Soop | 22-124 | delivery | 68 d |
| BVES OFFICE | 22-125 | delivery | 68 d |
| Tersago | 22-126 | delivery | 68 d |
| Ptarmigan Meadows Depreciation Report | 22-127 | delivery | 68 d |
| Lee Boland | 22-128 | delivery | 68 d |
| Dease Lake Airport Septic | 22-129 | delivery | 68 d |
| Adam's Igloo Truss Design | 22-136 | delivery | 68 d |
| kent forster carport | 22-137 | delivery | 68 d |
| Gary Lecomte Deck | 22-138 | delivery | 68 d |
| Houston Pool | 22-139 | delivery | 68 d |
| Newell Foundry | 22-140 | delivery | 68 d |
| Shoop-McCreery Property Subdivision Hazelton | 22-141 | delivery | 68 d |
| TNDC Dease Lk Airport Sewage Sys | 22-171 | delivery | 68 d |
| ARCHIVED PROJECTS | 23-000 | field work | 68 d |
| Studio 9 DLK Friendship Centre Houston | 23-104 | billing and payment | 68 d |
| V&C Phase 4 | 23-118 | delivery | 68 d |
| Haftner Dungate Dr. Structural Houston | 23-120 | delivery | 68 d |
| Ambleside Group Concrete Testing | 23-148 | delivery | 68 d |
| HTS Mountain View Salvation Army Camp - DUPLICATE | 23-163 | delivery | 68 d |
| FOLDER STRUCTURE | 23-999 | delivery | 68 d |
| ARCHIVED PROJECTS | 24-000 | delivery | 68 d |
| Tricon Harbour View Townhouses - DUPLICATE | 24-101 | delivery | 68 d |
| BC Parks Bishops Bay Design - DUPLICATE | 24-102 | delivery | 68 d |
| OW Lk Kathlyn Elementary | 24-109 | delivery | 68 d |
| Seven Sisters Park Engineering and Design - Lot 1 | 24-110 | delivery | 68 d |
| Daycare Field Review 8 Fixes | 24-111 | delivery | 68 d |
| Menzel Hounds Pet Services | 24-112 | delivery | 68 d |
| Studio 531 | 24-113 | delivery | 68 d |
| Rapso | 24-114 | delivery | 68 d |
| Jennifer Swift | 24-121 | delivery | 68 d |
| Smit | 24-122 | delivery | 68 d |
| Kispox School | 24-124 | field work | 68 d |
| BC Housing Blonski | 24-125 | delivery | 68 d |
| Out of Hand | 24-126 | design development | 68 d |
| Kitwanga Cathy Morgan | 24-127 | delivery | 68 d |
| Rivard Timberframe Hislop Rd DUPLICATE | 24-128 | delivery | 68 d |
| DH Manufacturing Design Review & Project Completion | 24-136 | delivery | 68 d |
| Wildstone MT Smithers WTP | 24-139 | delivery | 68 d |
| CCB Peterson Front Porch | 24-140 | delivery | 68 d |
| Tsil Kaz Koh Foundation Assessment New Modulars | 24-141 | delivery | 68 d |
| Leffers Cistern Mountainview Camp - DUPLICATE | 24-142 | delivery | 68 d |
| Swift Residence Wrinch St. Hazelton | 24-143 | delivery | 68 d |
| Smit Prairie Rd Cabin HBM - DUPLICATE | 24-145 | delivery | 68 d |
| Hemkund Dev. MT Burger King Smithers | 24-151 | delivery | 68 d |
| Bouck Slab on Grade and Step Code Halliday St - DUPLICATE | 24-152 | delivery | 68 d |
| Slamang Basement Suite 7th Ave Smithers DUPLICATE | 24-153 | delivery | 68 d |
| Longhouse | 24-154 | delivery | 68 d |
| Grassy Plains Construction | 24-155 | delivery | 68 d |
| BC Parks MT at Ross Lake | 24-156 | delivery | 68 d |
| Simpson Home & Suite | 24-162 | delivery | 68 d |
| Doug D. Home Lk Kathlyn Rd | 24-163 | delivery | 68 d |
| Genx Bros. Viewing Platform Houston | 24-164 | delivery | 68 d |
| deHoog High Rd Shop-Apartment | 24-165 | delivery | 68 d |
| N. Central Iskut Electrical Seismic Certification | 24-166 | delivery | 68 d |
| Evelyn Mtn View Farms Dugouts - DUPLICATE | 24-167 | delivery | 68 d |
| West Horizon MT Cycle 16 Path | 24-168 | delivery | 68 d |
| Genx Boxhorn Twin Valley BCBC Review & Improvements - DUPLICATE | 24-174 | billing and payment | 68 d |
| Viking Const. MT & Layout Survey Kispiox Health Centre | 24-175 | delivery | 68 d |
| Radloff Material Testing Witset WTP | 24-176 | delivery | 68 d |
| Grassy Plains Hall Construction - DUPLICATE | 24-177 | delivery | 68 d |
| Tricon Lax Kw'alaams Daycare Trusses - DUPLICATE | 24-178 | delivery | 68 d |
| SD54 Twain Sullivan Elementary Houston Timberframe Entry As & When - DUPLICATE | 24-179 | delivery | 68 d |
| Smithers Fire Centre Cost Estimate GS25NWE0136 | 24-180 | delivery | 68 d |
| T Brewer Colleymount Rd Subdivision Francois Lk | 24-186 | delivery | 68 d |
| MATERIAL TESTING Folder Structure | 24-999 | delivery | 68 d |
| ARCHIVED PROJECTS | 25-000 | field work | 68 d |
| PROPOSALS | 25-001 | billing and payment | 68 d |
| Telkwa Firehall Feasibility | 25-101 | delivery | 68 d |
| Grassy Plains MWR Revised | 25-102 | delivery | 68 d |
| Beukema-Corneau Timberframe | 25-103 | delivery | 68 d |
| N. Central Fire Stop Inspection & Certification - DUPLICATE | 25-109 | delivery | 68 d |
| Gitanmaax Firehall | 25-110 | delivery | 68 d |
| Tricon | 25-111 | delivery | 68 d |
| North Valley Subdivision | 25-112 | delivery | 68 d |
| HTS RUGGED STRUCTURAL | 25-113 | billing and payment | 68 d |
| Pellow Const. Carriage House Struc. and Energy 4594 Simcoe Loop - DUPLICATE | 25-114 | delivery | 68 d |
| Tricon Gitanyow Elders - DUPLICATE | 25-115 | delivery | 68 d |
| Radloff Material Testing Witset WTP - DUPLICATE | 25-121 | field work | 68 d |
| Houston Secondary School Floor System | 25-122 | delivery | 68 d |
| NO SHARE | 25-123 | delivery | 68 d |
| Datoff Bros MT Burns Lake - DUPLICATE | 25-124 | field work | 68 d |
| DeVries Timberframe | 25-125 | delivery | 68 d |
| DoF | 25-126 | delivery | 68 d |
| West Fraser CT 3520 Victoria Dr. Smithers - DUPLICATE | 25-127 | field work | 68 d |
| S. Army Mountainview Camp water System Review & Upgrade - DUPLICATE | 25-128 | delivery | 68 d |
| Arvind Houston | 25-135 | field work | 68 d |
| Westwind MT DLK Daycare Houston - DUPLICATE | 25-136 | field work | 68 d |
| Nadina Wildfire Base | 25-137 | delivery | 68 d |
| S. Wright Carriange House 3677 18th Ave Smithers | 25-138 | delivery | 68 d |
| Macleod Truss Inspection 4375 Elm Street Smithers | 25-139 | delivery | 68 d |
| HTS Rugged Edge Shop Victoria Dr Smithers | 25-147 | delivery | 68 d |
| Cam Thompson Porch Roof | 25-148 | delivery | 68 d |
| Kispiox Band Office Energy Advisory - DUPLICATE | 25-149 | delivery | 68 d |
| Rebinsky Septic Sys 3755 Powell St - DUPLICATE | 25-150 | delivery | 68 d |
| CCB Beukema Timber Frame 15140 Old Babine - DUPLICATE | 25-151 | delivery | 68 d |
| West Horizon MT Princess St | 25-152 | billing and payment | 68 d |
| Doug La Building Review 18657 Payne Rd | 25-153 | delivery | 68 d |
| N. Valley 3064 Hwy 16 Subdivision | 25-160 | delivery | 68 d |
| Daron Miller Lot 9 HBME | 25-161 | delivery | 68 d |
| Tri-Tech MT Smithers Safeway | 25-162 | delivery | 68 d |
| VanGrootheest Stairs 1573 Main St | 25-163 | delivery | 68 d |
| GNC Structual Inspection 15108 Kitsequecla Lake Rd CANCELLED | 25-164 | delivery | 68 d |
| Elite 1539 Walnut St. Structural Assessment | 25-165 | billing and payment | 68 d |
| PNC MT Suskwa Trail - DUPLICATE | 25-172 | field work | 68 d |
| MT FOLDER STRUCTURE | 25-999 | delivery | 68 d |
| 0 QUICKBOOKS PROPOSALS | 26-000 | delivery | 68 d |
| Northern Edge Improvements | 26-002 | delivery | 68 d |
| HSS PHASE 2 | 26-003 | field work | 68 d |
| Reed-CN Septic | 26-004 | design development | 68 d |
| Access Engineering Interim RPE and Temp Engineer of Record Services | 26-101 | delivery | 68 d |
| Impact Engineering BV Pool Assessment | 26-107 | field work | 68 d |
| BC Wildfire Nadina Fire Base | 26-108 | design development | 68 d |
| BVFMS Smithers Fairgrounds Grandstand Replacement | 26-109 | delivery | 68 d |
| DKI Structural Assessment 4069 10th Ave Smithers | 26-110 | delivery | 68 d |
| SD54 HSS Floor Structural | 26-111 | delivery | 68 d |
| HTS St. James Kitchen Improvements 1636 Princess St | 26-112 | billing and payment | 68 d |
| PRS-91 Strata Council Depreciation Report | 26-113 | field work | 68 d |
| CT3 | 26-120 | delivery | 68 d |
| CT3 | 26-121 | delivery | 68 d |
| CCB Ambleside Lot 12 Krause-Anderson Residence | 26-122 | delivery | 68 d |
| Glen Boonstra ICF Residence Re-design | 26-123 | billing and payment | 68 d |
| Rebinsky Onsite Sewerage System | 26-124 | delivery | 68 d |
| Viking Const. MT Health Centre 1405 Mary Blackwater Dr. Kispiox | 26-130 | billing and payment | 68 d |
| Westwind Subgrade Acceptance DLK Daycare & Friendship Centre Houston | 26-131 | billing and payment | 68 d |
| Pete Vandergaag MT NESA Building 1621 Main St Smithers | 26-132 | field work | 68 d |
| Westwind Water Quality Sampling DLK Friendship Ctr & Daycare | 26-133 | billing and payment | 68 d |
| Houston Christian School Pergola | 26-134 | design development | 68 d |
| HTS Groot Shop Lake Kathlyn | 26-135 | billing and payment | 68 d |
| Example | 26-999 | field work | 68 d |
| PIP-03 verification lead — safe to archive/renumber | 26-153 | proposal out | 37 d |
| PIP-03 verification lead 2 — safe to archive/renumber | 26-154 | proposal out | 37 d |
| PIP-03 verification lead 3 — safe to archive/renumber | 26-155 | proposal out | 37 d |
| PIP-03 verification lead 5 | 26-157 | proposal out | 36 d |